
01 / 01
RemodelingDesign-build remodeling with a dedicated project manager, in-house cabinetry, tile, and finish crew. Fixed-price contracts. Weekly written progress updates.
✓NARI Certified Remodeler on staff
✓Fixed-price contracts — no cost-plus surprises
✓In-house cabinetry, tile, and finish carpentry
✓Weekly Friday update with photos and % complete

Top 3% nationally
We do not treat every project in this category as the same job. Scope, disruption, budget, and long-term value change depending on which path fits the house and your actual goals
Cabinetry, appliances, lighting, plumbing, flooring, and finish sequencing all collide here, so management matters as much as craftsmanship.
These jobs are won or lost in waterproofing, slope, backing, venting, and finish details you rarely see after tile goes up.
These projects touch framing, insulation, mechanicals, egress, and moisture management before they ever become finish work.
Every line item below is in the contract. No surprises, no "we'll figure it out on-site." If we do the work, these are part of the price.
Measure, scope interview, rough 3D layout.
Cabinets, counters, tile, fixtures — all specified and ordered by us.
Contained demo. Negative-air machines for dust. Dumpster on-site.
Walls, headers, LVL beams if needed. Permits pulled by us.
Licensed subs for electrical, plumbing, HVAC — we coordinate, they don't run the job.
Level 4 finish standard, level 5 available.
Cabinets, trim, doors — by our crew, not a sub.
Walk the whole space, list issues, fix, walk again.
CATCH IT EARLY AND THIS IS A
ROOFING JOB.
WAIT TOO LONG AND IT BECOMES
ROOFING + DECKING + INSULATION +
CEILING.
If the room fights how you live, finishes alone usually do not fix the real issue.
Old leaks, soft subfloor, or stained drywall usually mean the remodel needs corrective scope, not just cosmetics.
Multiple old fixes often hide inconsistent framing, wiring, plumbing, or surface prep.
The fastest way to lose budget is starting demo before priorities and allowances are clearly set.
Semi-custom cabinets, quartz counters, mid-grade appliances, tile backsplash, LVP or tile floor.
Custom tile shower, freestanding tub or glass enclosure, double vanity, heated floor option.
Framing, electrical, drywall, flooring, drop ceiling or drywall. Full bath adds ~$18K.
Flooring, paint, trim, fixtures throughout. Great pre-sale or pre-move-in.
30-minute phone call to understand scope, timeline, budget range.
On-site 1-2 hours. Measure, photograph, discuss. $250 fee, credited back.
Line-item, all-inclusive. Valid 60 days. No change-orders without sign-off.
Material approvals, final selections, crew scheduling.
Typical kitchen: 6-10 weeks. Bath: 3-5 weeks. Basement: 4-8 weeks.

01 / 01
RemodelingBased in Hudson, we cover all of Penobscot County — and the closer neighborhoods of Hancock and Waldo counties. 45-minute radius from our yard, same-day response within 30
More questions? Call +1 (207) 219-5669 or request an estimate — we don't believe in pressure sales.
On-site visit, drone scan if relevant, written line-item quote within 48 hours. No pressure, no fine print.